1. Requirement:
Planned work time is : 20:15 - 32:15, no break.
If there is no absence between 20:15-24:15, EE will get 1 time night allowance.
2. My solution: T510S
Use GWT S DZL to generate night allowance.
3. Test data
Infotype 2001:
Personnel leave: 21:15 - 21:45
Infotype 2011
Time Evaluation Log:
In my view, there should not be Noon allowance generated,
because 21:45 + 3.99 = 25.44, so no overlap with T510S,
any body know the reason?
Thank you in advance.