Hi forum,
We are handling services contracts with a high amount of items (between 1000 and 4500 items). The problem we are encoutering is that nearly every step during contract processing takes a lot of time.
Ex for contracts with 1300 items :
- switching to "edit" mode : 40 seconds
- clicking on "change processes" in the "more" menu of the contract : 29 seconds to display change process list
- clicking on change process : 30 seconds to display options of the chosen change process
- clicking on "back" to return on the contract : 20 secondes
- saving modifications : 1 minute
=> Does anyone know of any standard optimization actions that we can set into place for the contract ? (or if these durations are "normal"?)
Many thanks,
Eli