Dear Experts,
We are going thro’ the phase of MPS/MRP, we want to know the activity/process flow of an Planner who is planning “Finish Goods”.
- Ours is a MTO scenario,
- “In-House Prd Days”, PTF, GR Processing Time is defined for each FG material,
- BOM & Routing is in place,
- All config is in place (e.g. Backward scheduling, MRP Controller etc),
- Sales Orders are entered outside PTF (i.e. with sufficient lead time),
- Plant Level MRP (MD01/MDBT) will be done every night,
- MRP results can be seen in MD05, MD06 & Stock Requirement list in MD04,MD07.
Now we want help to design the each fine activity/process for a Planner who is planning for “Finish Goods”, what actions needs to be taken & when.
It there any documentation available for the same?
Thanks in advance,
Srinathan.